Renovation
of corporate building in Rīga, Spilves street 2a.
Total building area was 550 sq.m.
Two new storeys were built walls and decks were constructed. The heat insulation of the
building was performed on the facade, which then was covered by decorative facing. In the
construction of the roof profiled tinplate was used and heat insulation using special wadding
was applied below the covering.
The interior works included the building walls using gypsum pasteboards. The paintwork was
used as the main decoration material, which was combined with tiles in bathrooms. Durable
linoleum was decked in office rooms.
View image gallery of the object >>
Back to the list of objects << |